Monday 22 October 2012

Renovation of putting surfaces proceeded as planned this Monday 22nd and Tuesday 23rd October despite the poor weather on the Monday.
Rainfall on the Monday made it difficult to topdress and brush in due to not being able to dry the topdressing sand out.
This has improved on Tuesday with the wind and sun drying out the sand and yesterdays topdressing is now drying sufficiently enough.
Putting surfaces should recover over then next 3 weeks once renovation fertiliser takes affect.



Members should note the 'Local Rule Board' as a preferred lie within 6 inches (150mm) is in affect on all cored greens and collars.