Groundstaff had the unenviable this week of cleaning out our lower irrigation dam.

The automatic valve that allows water from the top dam to the lower dam was shut off and an irrigation programme set up overnight to lower the water level of this lower dam.

When we arrived for work in the morning the water level had subsided enough to allow staff to enter the dam and manually clean out the organic material (leaves, sticks etc) that had accumulated in the dam in particular at the eastern edge near the 15th green.

This work has presented the dam in much better condition especially in the shallow areas.

In the coming weeks we shall be conducting some repairs to the dam wall on the 14th (North) side as a section is tending to collapse towards the water.